
This is the Third day of our painting. Green and I have been spending considerably good amount of time at the new house painting and cleaning up the front yard a bit. The master room and the watching room are done. Today the living room is 98 percent done, so my room, Kitchen and the front room, plus the bathroom are still on the list. Al has been packing up for the last two weeks and keep going and when we asked me if I'm done with my packing, I said, "Finish soon," which means I'm touching nothing so far but Hotman's belongings and my clothes. My room is in a complete mess at the moment, I let the DVD scattered around in front of the TV, tons of papers on/under the table, and not to mention I'm loosing my excessive greed in sleeping at nite. Yeah, I listen to Jason Mraz's latest album--the whole songs--over and over again so I can get some good sleep. Sure, it works most of the time.
"It should be done for the next two days, OK?"
"Sure."
There are some other things that have to be dealed with soon like the upgrading the Power, Setting up the perfect place for the washing machine, and also the front yard. The separating fence has been set up today. Basically, I dont do much work, it's Green who plays with the roller and the brush, still, this time-consuming thing is a bit tiring. lol
The rain is another bad/good thing that has been going on for months now. We all simply hope the day of our moving will be perfect, "We'll move on Sat," Al's been telling us all. Amen for that.
So, we're a bit running out of time to finish the paint but Green convinced me that it'll be on time.
No comments:
Post a Comment